• Rizhao port lanshan port ore conveying system in the south a

    My company won the bid at the end of 2010 south area of rizhao port lanshan port ore conveying system engineering design and construction general contracting project, design, construction plan has been completed. My company engineering and technical perso

    2011-02-28 Website editor 202

  • Lean management hurried production

    Of zigong, there is a budding new group, economic take-off jump, market operation, prospect infinite good, management but slow hysteresis, leadership, there are deep, words, line will be good and machine group to develop, to consummate the management syst

    2011-02-28 Website editor 223

  • The moon is not floating clouds

    Firecrackers sound tiger, snow in succession to meet the rabbit. With all the hard work and sweat, unconsciously we have passed in a year. In 2010 for the world economy is a special year, again, for transporting machine group co., LTD. Is a special year.

    2011-02-28 Website editor 148

  • With a technically challenging tubular belt conveyor was bor

    Our company manufacture installation one-time overloaded successful commissioning of the tubular belt conveyor. This net news on November 11, 2009, in shaanxi YaoBai (well-being) cement co., LTD., along the cement mineral raw material conveying system eng

    2009-11-18 Website editor 138

  • Long tubular belt conveyor snaps

    Congratulations to my company research and development manufacture of the technical challenges of super long long tubular belt conveyor, one-time overloaded successful commissioning.

    2009-11-18 Website editor 143