The location of tubular belt conveyor in suizhong power plant is south of suizhong power plant and west coast of liaodong bay, bohai sea. The starting point of tubular belt conveyor is located at the wharf in the sea area. The DG600 tubular belt conveyor has a length of 2.8km, a belt speed of 5m/s and a conveying capacity of 3420t/h.
This project is a tubular belt conveyor with a very long distance DG600. After the installation of the conveying equipment, the supporting wharf project team of phase ii project of suizhong power plant immediately carried out no-load commissioning and no-load interlocking commissioning of the equipment in accordance with the commissioning plan of the conveying system. Completed the start and stop debugging of single machine equipment, tested the chain start and chain start of system control, completed various debugging tasks of no-load system in 5 days, and all equipment in the delivery system was in standby state of material testing. On June 28, 2019, the coal-carrying ship docked at the sea port successfully. DG600 tubular belt conveyor was started on standby with no load, ready for the first heavy load test. At 11:00 am, the sound of starting the ship unloader sounded, and the whole conveying system began to run with heavy load. The DG600 tubular belt conveyor of our company runs smoothly in the feeding stage and the running process of the belt, and all the parameters meet the requirements of the test plan and achieve the design goals.
Pan, deputy general manager of the supporting wharf project department of the second phase of suizhong power plant, spoke highly of our company's equipment. Field service personnel service quality is high, bears hardships and stands hard work, on the equipment installation and debugging experience is very rich, our project from no-load commissioning to overloading debugging, time in 7 days to complete, greatly is beyond the expectation of our project department, so well with your company, of course, debugging equipment overall design, detail design is in place, there is a lot of relationships; It took us shenhua more than 20 days to complete the commissioning of tubular belt conveyor in another power plant. Your zigong conveyor products are very good. We look forward to more project cooperation between us.
Zigong transport machine provides high quality material transport solutions for more customer service.