Export Vietnam at the creek 2 x 220 mw thermal power plant p

2011-03-28 08:39 Website editor
Our company won the bid in early March 2011 Export Vietnam 2X220MW Thermal Power plant tubular Belt Conveyor has completed the design in mid-March 2011, our engineering and technical personnel have been to Vietnam survey site and with thermal power plant related personnel to carry out the design of the validation.

Project Overview: The owner of the project is Vietnam National Coal-mineral industry group. The project uses two tubular belt conveyors to transport the ash slag from the Ash depot to the ash field for stacking. The main equipment of the system includes #1 tubular belt conveyor, #2管状带式输送机, #1灰渣转运塔 (concrete structure), #2灰渣转运塔 (steel structure).

1# Tubular Belt Conveyor throughput 400t/h, pipe diameter ø300mm, belt speed 2.5/s, conveyor length 187m, lifting height 8.7m.

#2管状带式输送机输送量400t/h, pipe diameter is ø300mm, with speed 2.5m/s, conveyor length 1040m, lifting height 35.8m. (Marketing Dept./Chen Shisi)