Xi -

2011-05-31 08:25 Website editor
At the end of March this year, the company completed the export of the first phase of the Indonesian Lanta mine long-distance belt conveyor system engineering technology, business negotiations and signed a supply contract, to achieve direct export single contract billion yuan.

Indonesian Lanta Phase I mine long-distance belt conveyor delivery system, the total length of 15km. The conveyor system consists of a whole DG250 tubular belt conveyor (length: 3700m), a down-transport curve belt conveyor (length: 6300m), a Groove belt conveyor (length: 5000m) composed of a tube. (Marketing Dept./Chen Shisi)